Commercial Lighting Rebates

Poudre Valley REA offers a variety of rebates for certain LED lighting applications:

  • LED Refrigerated Case Lighting - New Construction & Retrofits
  • Pole Mounted LED Lighting
  • Commercial Lighting LED Retrofit & New Construction Projects
  • ​*Rebate applications must be submitted within 90 days of installation date

Download Rebate Application

Submit application to rebates@pvrea.com.


LED Refrigerated Case Lighting New Construction & Retrofits

Rebate

  • $60 per door for reach-in cases.
    • Capped at 50 doors or equivalent ($3000 per project).
  • $10 per linear foot for top lighting of multi-deck open cases.
    • Capped at 50% the fixture material cost.

Documents Required


Pole Mounted LED Lighting

Eligibility

  • must be pole mounted to qualify
  • minimum 2,100 lumen output required

Rebate

Minimum Fixture Lumens LED Lighting Incentive per Fixture (if smaller than 1/4 cost of head) Nominal Watts of Actual or Equivalent Metal Halide or HID Lamps
29,000 $475 1,000
13,000 $200 320-400
7,000 $130 250
5,000 $80 150-175
3,000 $55 100
2,100 $44 70-75

* The actual incentive will be the lower of: 

  • The lower of an incentive table based on lumen output
  • 1/4 of the material cost for each head or retrofit kit
  • $20,000 per project

Documents Required

  • Rebate Form (excel spreadsheet)
  • Invoice showing cost per head
  • Manufacturer's data sheets
  • Sketch or layout with dimensions of lighting project
  • Rebate application must be submitted within 90 days of installation date

Commercial Lighting LED Retrofit & New Construction Projects

Eligibility

  • Project is a single, contiguous location.
  • Pre-approval by PVREA and Tri-State.
  • To ensure eligibility, PVREA encourages submitting the project prior to start of construction.
  • See the rebate form for more eligibility requirements.
  • Per project cap of $20,000.

Documents Required

  • Rebate Form (excel spreadsheet)
  • Invoice
  • Manufacturer's data sheets
  • Material pricing of lamps
  • Rebate application must be submitted within 90 days of installation date